ABS Sensor Front D2 *Long Lead* (EUROSPARE) SSW500020
£17.99
£14.99
SKU
SSW500020ES
New front ABS sensor which will fits all Discovery Td5 & V8 models from 1998 to 2005
This is long lead type designed to be wired direct to the ECU
| SKU | SSW500020ES |
|---|---|
| Country of Manufacture | Taiwan |
| Manufacturer | Eurospare |