ABS Sensor Front D2 *Long Lead* (Britpart) SSW500020
£31.66
£26.38
SKU
SSW500020
New front ABS sensor which will fits all Discovery Td5 & V8 models from 1998 to 2005
This is long lead type designed to be wired direct to the ECU
| SKU | SSW500020 |
|---|---|
| Country of Manufacture | Taiwan |
| Manufacturer | Britpart |