ABS Sensor Rear D2 *Long Lead* (Wabco) SSW500030G
£143.99
£119.99
SKU
SSW500030G
New rear ABS sensor which will fits all Discovery Td5 & V8 models from 1998 to 2005
This is long lead type designed to be wired direct to the ECU
| SKU | SSW500030G |
|---|---|
| Country of Manufacture | United Kingdom |
| Manufacturer | Wabco |