Wheel Bearing Hub & ABS Long lead Sensor Rear Disco 2 (Britpart) TAY100050
£79.90
£66.58
SKU
TAY100050L
wheel bearing hub with long lead ads sensor which is wired direct to abs ecu in the vehicle
fits all TD5 models from 1998 to 2004
- will also require FTC4919 o'ring to fit this item
SKU | TAY100050L |
---|---|
Country of Manufacture | Taiwan |
Manufacturer | Britpart |