Wheel Bearing Hub and ABS Long lead Sensor Rear Disco 2 (Britpart) TAY100050
£79.90
£66.58
SKU
TAY100050L
wheel bearing hub with long lead ads sensor which is wired direct to abs ecu in the vehicle
fits all TD5 models from 1998 to 2004
- will also require FTC4919 o'ring to fit this item
| SKU | TAY100050L |
|---|---|
| Country of Manufacture | Taiwan |
| Manufacturer | Britpart |
Related Products
Check items to add to the cart or



