Wheel Bearing Hub With Long Lead ABS Sensor Front Disco 2 (Britpart) TAY100060 TAY100060L
£79.90
£66.58
SKU
TAY100060L
Wheel bearing & Long Leaded ABS sensor which is wired to the ecu in the vehicle
to fit all TD5 models from 1998 to 2004
| SKU | TAY100060L |
|---|---|
| Country of Manufacture | Taiwan |
| Manufacturer | Britpart |
Related Products
Check items to add to the cart or





