Wheel Bearing Hub &With Long Lead ABS Sensor Front Disco 2 (Britpart) TAY100060
£79.90
£66.58
SKU
TAY100060L
Wheel bearing & Long Leaded ABS sensor which is wired to the ecu in the vehicle
to fit all TD5 models from 1998 to 2004
SKU | TAY100060L |
---|---|
Country of Manufacture | Taiwan |
Manufacturer | Britpart |